Welcome to the Arctic Mine Development Project Environmental Impact Statement Public Involvement Site
This site provides information about the Environmental Impact Statement (EIS) process for the Arctic Mine Development Project proposed by Ambler Metals, LLC. The U.S. Army Corps of Engineers (USACE), Alaska District is the lead federal agency overseeing the preparation of the EIS due to the proposed impacts to waters of the U.S. including wetlands, which require a permit from USACE under Section 404 of the Clean Water Act.
Learn about the EIS
Access information, materials, reports, and notices.
Stay informed
Get updates on public meetings, comment periods, and key milestones.
About the Project:
Ambler Metals LLC proposes to develop the Project, an open-pit hard rock mining operation, at the Arctic Deposit in the Ambler Mining District of northwestern Alaska. The Project is designed to process approximately 11,000 short tons per day (t/d; 10,000 tonnes per day [tonnes/d]) of ore and produce copper, zinc, and lead concentrates, with commercial quantities of gold and silver also expected to be recovered. Major Project facilities would include the open-pit mine, ore processing facilities, tailings and waste rock management facilities, water management infrastructure, access roads, airstrip improvements, and associated support facilities. Construction is expected to require approximately 3 years followed by an anticipated operating life of approximately 13 years.
The Project would have a total disturbance footprint of approximately 1,727.2 acres (699 hectares [ha]) including the mine site and new construction or improvement of two access roads. Fill placement would result in permanent impacts to approximately 120.7 acres (48.9 ha) of wetlands and other waters including approximately 110.6 acres (44.8 ha) of wetlands and 10.1 acres (4.1 ha) in other waters (i.e., ponds and streams).
Ore would be recovered using a conventional truck-shovel mining operation. The final pit would contain approximately 51 million short tons (46.7 million tonnes) of ore and approximately 375 million short tons (340 million tonnes). Ore would be processed on site to produce copper, zinc, and lead concentrates for shipment to off-site markets.
Tailings would be stored within an engineered tailings management facility at the headwaters of Subarctic Creek and would be supported by an engineered dam, an adjacent waste rock facility, and the natural topography of the surrounding steep valley walls. The tailing management facility would have sufficient storage to accommodate tailings, mine production water, and flood volume 1.5 times the probable 100-year maximum flood event. A water treatment plant would treat contact water (i.e., water coming into contact with mine waste rock, tailings, facilities, or collected in the open mine pit) to State of Alaska standards before discharge to Subarctic Creek. Diversion channels and other water management features would be constructed along the edges of the mine site to reduce the volume of contact water.
The Project would include two primary gravel access roads. The South Route would connect the existing Dahl Creek Airstrip to the Ambler Access Project (AAP), while the North Route would connect the AAP to the Arctic Mine site. Development of these access roads would include upgrades to existing roads and trails between the Dahl Creek Airstrip and Bornite Camp and construction of new road segments between Bornite Camp and the AAP and between the AAP and the Arctic Mine site.
Mined ore would be processed into concentrate and stored in intermodal bulk shipping containers before transportation by truck from the mine site to Fairbanks via the project access roads, the recently permitted AAP, and the existing public road system. In Fairbanks, concentrate would be transferred to rail for transport to Anchorage, where it would be loaded onto marine vessels for shipment to smelters or refineries outside of Alaska.
Lead Agency and Cooperating Entities
Lead Federal Agency:
-
U.S. Army Corps of Engineers
Cooperating Entities:
-
U.S. Environmental Protection Agency
-
U.S. Fish and Wildlife Service
-
National Marine Fisheries Service
-
State Historic Preservation Office
-
Alaska Department of Natural Resources
-
Alaska Department of Fish and Game
-
Alaska Department of Environmental Conservation
-
Native Village of Ambler and City of Ambler
-
Native Village of Buckland and City of Buckland
-
Native Village of Deering and City of Deering
-
Native Village of Kiana and City of Kiana
-
Native Village of Kivalina and City of Kivalina
-
Native Village of Kobuk and City of Kobuk
-
Native Village of Kotzebue and City of Kotzebue
-
Native Village of Noorvik and City of Noorvik
-
Native Village of Selawik and City of Selawik
-
Native Village of Shungnak and City of Shungnak
-
Northwest Arctic Borough
EIS Process
What is an EIS?
An EIS is a detailed document required under the National Environmental Policy Act (NEPA) for federal actions that may significantly affect the quality of the human environment. It outlines the potential environmental impacts, both positive and negative, of a proposed project and evaluates alternative actions.
What is NEPA and why is an EIS required?
NEPA is a federal law that ensures environmental factors are considered in decision-making by federal agencies. An EIS is required when a proposed action may result in significant environmental impacts. The EIS process promotes transparency, informed decision-making, and public involvement. Under USACE regulations, the NEPA process must be completed before a permit can be issued. See the Alaska District EIS webpage for additional information.
Steps in the EIS Process
-
Notice of Intent (NOI) – a public announcement stating that a federal agency will prepare an EIS for a major project that solicits comments from the public relevant to the proposed action.
-
EIS – will describe the impacts of the proposed action and alternatives, and is published for review.
-
Record of Decision (ROD) – a formal public document issued by the USACE at the conclusion of the EIS process. The ROD:
-
Summarizes the agency’s final decision regarding a proposed action that was evaluated in the EIS.
-
Identifies the alternatives considered, including the environmentally preferred alternative.
-
Explains the rationale for the chosen alternative.
-
Describes mitigation measures that will be implemented to reduce environmental impacts.
-
Demonstrates compliance with applicable environmental laws and regulations.
Public and Agency Involvement
How to Engage with the Process
During public comment periods, stakeholders and the public are invited to submit comments and questions about the project via the online public comment form, email, mail, or in person at public meetings. Please see our Contact Us / Public Comments section for more information.
Public Participation Plan for Community Outreach Efforts
-
Public meetings
-
Email updates and newsletters
-
Tribal consultations
-
Opportunities to comment
How to Submit Comments
Public comments will only be accepted during the comment period for the NOI between September 18 – November 2, 2026. Please see our Contact Us / Public Comments section for project contact information.
Government-to-Government Consultations
Federally Recognized Tribes that believe that tribal rights and/or resources may be affected by this proposed action may request government-to-government consultation with USACE. If you wish to invite USACE to government-to-government consultation, please advise the District Commander in writing and provide the contact information of a person you would like the Commander’s staff to contact to begin coordination.
Fixing America’s Surface Transportation Act, Title 41
The Project is covered under the Title 41 of the Fixing America’s Surface Transportation Act (FAST-41). FAST-41 established a process for improving the timeliness, predictability, and transparency of environmental review and permitting of covered projects for project proponents and the public. The Project’s FAST-41 Permitting Dashboard and Timetable may be found here. USACE plans to issue a ROD concluding the EIS by September 15, 2028 and render a final decision whether to issue a Section 404 permit for the Project’s impacts to aquatic resources by September 22, 2028.
Meetings and Events
USACE conducted five public scoping meetings to provide opportunities for agencies, Tribes, stakeholders, and members of the public to learn about the proposed Project and provide input on the scope of the environmental review.
Meetings were held at the following locations:
-
Shungnak, Alaska: Tuesday, October 6, 2026 | 3:30 – 5:30 p.m.
-
Ambler, Alaska: Wednesday, October 7, 2026 | 3:30 – 5:30 p.m.
-
Kobuk, Alaska: Thursday, October 8, 2026 | 3:30 – 5:30 p.m.
-
Fairbanks, Alaska: Tuesday, October 13, 2026 | 5:30 – 7:30 p.m.
A Virtual Public Scoping Meeting was held:
Monday, October 19, 2026
5:30 p.m. – 8:30 p.m. (Alaska Time)
If you missed these meetings but would still like to provide comments, please see our Contact Us / Public Comments section for project contact information.
Documents and Reports
Location and Vicinity Map
(click image to open PDF preview)
Arctic Mine EIS Scoping Video - October 2026
Contact Us / Public Comments
Comments may be submitted online via the Comment Form (below), or via mail.
Public comments will only be accepted during the specified public comment time periods for the NOI. The NOI and EIS will be published online on Alaska District’s website:
https://www.poa.usace.army.mil/Missions/Regulatory/Public-Notices/Special-Public-Notices/
Online:
See the Public Comment Form (below) to submit comments or
ask questions.
Mail:
Arctic Mine Development Project EIS Comments
USACE – Alaska District, Regulatory Division
1046 Marks Road
Fort Wainwright, AK 99703
Public Comment Form
Scoping Comment Period:
September 18, 2026 12:00a.m. (Alaska Time) – November 2, 2026 11:59p.m. (Alaska Time)